Empowering Tomorrow's Infrastructure Today

Grid Keeper

Welcome to the Grid Keeper Investor Portal

Where advanced infrastructure meets disciplined execution.

This portal provides access to Grid Keeper’s Tier‑1 investor materials, offering a clear, validation‑first overview of our subsurface conduction platform and the 18‑month engineering sprint underway.

Grid Keeper is developing a new class of Earth‑referenced infrastructure based on Driven Oscillatory Telluric Current (DOTC) — a controlled, low‑frequency conduction system designed to support timing, low‑rate communication, and low‑energy delivery for industrial and utility applications.

Our approach is grounded in geophysics, conductivity modeling, and modern control systems. The validation program begins with simulation‑first verification, followed by controlled bench testing and alignment with early buyers in sensing, industrial telemetry, and resilience markets.

Inside this portal, you’ll find the core documents outlining our system architecture, validation phases, budget, acceptance criteria, and founder background. Each file is prepared for clarity, modularity, and investor diligence.

The Ask: $200,000

Phase 1 — Physics Modeling (ANSYS via SimuTech)

Quoted $75,000 — 2 months

Phase 2 — Engineering Modeling & Stability Analysis

Estimated $60,000 — 4–6 months

Prototype Bench Test

$5,000 — 1 month

Founder Funding

$60,000 — covers 18 months from start to sale

Executive Summary (PDF)

A concise overview of Grid Keeper’s DOTC architecture, validation plan, funding requirements, and 18‑month execution timeline.

Budget & Monthly Burn (XLS)

A detailed breakdown of projected costs across Phase 1, Phase 2, bench testing, and founder runway.

Pitch Deck (PDF)

A structured walkthrough of the problem, solution, DOTC system architecture, validation phases, budget, and early exit path. Includes appendix materials and acceptance criteria.

Asset Inventory (PDF)

A categorized list of all technical, operational, and documentation assets included in the Grid Keeper dataroom.

Dataroom File List (TXT)

A complete index of all files, documents, and artifacts available for investor diligence.

Team Bio (PDF)

Founder background, technical history, and the 13‑year R&D path leading to the DOTC architecture.

Phase Acceptance Checklist (PDF)

Measurable criteria for Phase 1 and Phase 2 completion, including physics thresholds and engineering stability metrics.

CONTACT

A blue circular logo featuring a grid pattern with a triangle inside, with the words 'GRID KEEPER' underneath.